Mounting
A
prefabricated anchor is placed in a prepared hole or is cast on site at the end
of each section


A hole is made Post
footing

the
post in asphalt. negotiating a bridge, this type of footing can be used.


Plastic spreaders are used between the ropes.
Installation of wire rope
Mounting of rigging screw.

Rigging screw
Check ropes are installed on
each wire.

End fittings and check ropes mounted in anchor
Tensioning
Tension the wire ropes with the nuts at the anchors. Tension each wire at
the rigging screws, starting on the middle.
Repair of side and central barriers
In order to guarantee the quality, function, lifetime and standards of
service for our products, we train the service personnel every stretch of
highway that has been fitted with our fencing. This is part of our policy of
following our products through all stages of manufacture and use.
The ropes are lifted straight up. Bent posts are removed, new posts are
put into position. The ropes are lowered and the spreaders are reassembled.


Bent post Assembly