Safence central and side barriers

 

Mounting

 

 

Anchor

 

A prefabricated anchor is placed in a prepared hole or is cast on site at the end of each section


    

Prefabricated anchor                                             Anchor cast on site

 

 

Post

 

A hole is made with a power hammer and a footing is placed in the hole.

 

    

A hole is made                                                        Post footing

 

 


    
A steel socket can be used when mounting             If it is impossible to make a hole, for example when 

the post in asphalt.                                                negotiating a bridge, this type of footing can be used.

 

 

Installation of wire ropes.

 

 

 

 

 

Swage of end fittings

 

 

 

 

 

 

 

 

 

 

 

Plastic spreaders are used between the ropes.

 

 

 

 

 

 

Installation of wire rope

 

 

 

End fittings and rigging screw.

Mounting of rigging screw.

Rigging screw

 

 

Check ropes are installed on each wire.

End fittings and check ropes mounted in anchor

 

 

 

Tensioning

 

Tension the wire ropes with the nuts at the anchors. Tension each wire at the rigging screws, starting on the middle.

 

 

 

Repair of side and central barriers

In order to guarantee the quality, function, lifetime and standards of service for our products, we train the service personnel every stretch of highway that has been fitted with our fencing. This is part of our policy of following our products through all stages of manufacture and use.

The ropes are lifted straight up. Bent posts are removed, new posts are put into position. The ropes are lowered and the spreaders are reassembled.


 

Bent post                                                                  Assembly

 

Fence repair slideshow